Due in 55 daysSolicitation
Power Supply, in Repair/Modification of
Dept. of Defense · Dept. of the Navy
Key details
- Response deadline
- Jan 22, 2027, 3:30 PM EST (Due in 55 days)
- Solicitation number
- N0010423QNA58
- Notice type
- Solicitation
- Set-aside
- None (full and open competition)
- Small business limit
- Small if no more than 700 employees
- Product/service code
- 6130
- Office
- Navsup Weapon Systems Support Mech
- Posted
- Nov 23, 2026
Description
CONTACT INFORMATION|4|N744.8|GE7|717-605-7751|STEVE.SMITHEY@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|TBD|TBD|TBD|TBD|TBD|N/A|N/A|TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WEAPON SYSTEM SUPPORT| EQUAL OPPORTUNITY (SEP 2016)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|335931|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This solicitation is for the REPAIR of 5 each NSN 6130 01-312-8446 in accordance with Reference number 948E275G1.Replacement or new procurement will not be considered. The Government does not own the drawings or data rights to this NSN. 2. Government-Source Inspection and Acceptance (G-S I&A) is required. If the G-S I&A will occur at a different CAGE from the Admin Award CAGE, please provide the repair facility CAGE and/or packaging CAGE with the quote. 3. MIL-STD Packaging is required and it will not be waived. 4. Please provide the following information in the repair quote: A. Your CAGE (used as the awardee CAGE):___________________ B. the unit repair price: $____________________________________ and whether this price is firm-fixed price (FFP)_____; or estimated (EST)______ C. Repair turn-around me (number of days from receipt of asset(s) to shipment of repaired asset(s):_______DAYS D. Throughput Constraint: _____/month. Refers to the total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflects no throughput constraint. E. The new procurement cost of this NSN (if known): $________________________ F. Is this item (NSN) OBSOLETE: YES____ or NO _____ G. The repair CAGE _____________ and packaging CAGE___________ (as described in #2). PLEASE NOTE THE FOLLOWING WHEN GENERATING YOUR QUOTE: We are requesting that the quote's validity extend for 8 months from the submitted proposal date. Teardown and evaluation only quotes will NOT be accepted. Induction Expiration Date: 120 days after the date of subsequent award. Any asset received after this date in days is not authorized to be repaired without bi-lateral agreement between the vendor and Contracting Officer. If Firm-Fixed Repair Pricing is provided, Beyond Economical Repair (BER) does not exist. With DCMA concurrence, Beyond Repair (BR) is possible. If the unit is determined BR, the unit price will negotiated downward from the awarded Firm-Fixed Repair price. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Requested RTAT: 460 Days Proposals shall reference the proposed RTAT and any capacity constraints. 5. Since there is only one business concern capable of performing repa…
Full text and attachments are on SAM.gov.
Source: SAM.gov notice 58d6f511d18e4f6189e4325aa0d9bdf2. Last checked Nov 27, 2026. Always confirm details, amendments and attachments on the official notice before you respond.