Due in 56 daysSolicitation
TI16-S71, Svr, Mf/Hf, in Repair/Modification of
Dept. of Defense · Dept. of the Navy
Key details
- Response deadline
- Jan 19, 2027, 3:30 PM EST (Due in 56 days)
- Solicitation number
- N0010427QNA64
- Notice type
- Solicitation
- Set-aside
- None (full and open competition)
- NAICS code
- 334515 Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
- Small business limit
- Small if no more than 750 employees
- Product/service code
- 7E20
- Office
- Navsup Weapon Systems Support Mech
- Posted
- Nov 18, 2026
Description
CONTACT INFORMATION|4|N744.11|BL5|771-229-0480|rachel.e.kern4.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|NA|TBD|N00104|TBD|TBD|See Schedule|TBD|NA|NA|TBD|||||| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|$25,000.00| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|POC on page 1| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 Days ARO| OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)|1|365 Days ARO| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This solicitation is for the repair of 4 each of NSN 7035 016605981 IAW Reference number N147781. Replacement or new procurement will not be considered.The Government does not own the drawings or data rights to this NSN. 2. Government-Source Inspection and Acceptance (G-S I&A) is required. If the G-S I&A will occur at a different CAGE from the Admin Award CAGE, please provide the repair facility CAGE and/or packaging CAGE with the quote. 3. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms ofthe contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. a. Requested RTAT: 110 Days b. Proposals shall reference the proposed RTAT and any capacity constraints. 4. Please provide the following information in the repair quote: a. Your CAGE (used as the awardee CAGE):___________________ b. the unit repair price: $____________________________________ and whether this price is firm-fixed price (FFP)_____; or estimated______ c. Beyond Repair (BR) Price $____________. d. Repair turn-around (number of days from receipt of asset(s) to shipment of repaired asset(s):_______days e. Throughput Constraint: _____/month. Refers to the total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflectsno throughput constraint. f. The new procurement cost of this NSN (if known): $________________________ g. Is this item (NSN) OBSOLETE: YES____ or NO _____ h. The repair CAGE _____________ and packaging CAGE___________. 5. teardown and evaluation only quotes will NOT be accepted. 6. Induction Expiration Date: 365 days after the date of subsequent award. Any asset received after this date in days is not authorized to be repaired without bi-lateral agreement between the vendor and Contracting Officer. 7. If Firm-Fixed Repair Pricing is provided, Beyond Economical Repair (BER) does not exist. With DCMA concurrence, Beyond Repair (BR) is possible. If the unit is determined BR, the contract will be definitized at the agreed upon BR unitprice. 8. All contractual documents (i.e. contracts, purchase orders, …
Full text and attachments are on SAM.gov.
Source: SAM.gov notice e5d027e84b354828961c525d667ce331. Last checked Nov 24, 2026. Always confirm details, amendments and attachments on the official notice before you respond.