Skip to content
FedBidAlerts
Due in 13 daysSpecial Notice

631-21-011 Build Elevator Tower for Building 25 A/E Design SF330 Request for Qualifications

Department of Veterans Affairs

Key details

Response deadline
Dec 7, 2026, 4:00 PM EST (Due in 13 days)
Solicitation number
36C24126Q0518
Notice type
Special Notice
Set-aside
None (full and open competition)
Product/service code
C1AZ
Office
241-network Contract Office 01 (36c241)
Posted
Nov 5, 2026

Description

SPECIAL NOTICE FOR QUALIFICATIONS (SF 330) NAICS Code: 541330 Engineering Services (Small Business size standard $25.5M) A. INTRODUCTION: The VA Central Western Massachusetts Healthcare System (CWM HCS) plans to build and install a new elevator tower at Building 25 on the Leeds Campus. This project will correct a FCA deficiency. Provide all professional architectural and engineering (A/E) Part One Services (also known as Design Phase Type A & Type B Services) necessary to develop complete drawings, specifications, and cost estimates associated with building a new elevator tower at Building 25 and Part Two Services (also known as Construction Period Services Type C). The intent of this project includes but is not limited to: Evaluate existing elevator pit slab for buildings 1, 2, 3, 4, 5, 6, 7, 8, 12, 16, 20, and 26 and design an elevator pit sump pump with oil interceptor. Design plumbing of oil water separator to sanitary sewer. See acceptable conceptual design attached. This conceptual design shall be validated. This shall be used to minimize and inform design efforts. Identify and address any issues or conflicts as necessary. If the elevator tower appearance is different than the conceptual design, conduct a Section 106 Historical Submission Report for VA to file with Massachusetts State Historical Preservation Office, by a Professional Historic Preservation Consultant. Existing report will be made available to the highest rated A/E firm. Conduct code compliance reviews (NFPA, ABAAS, VA Design Manuals, etc.) and integrate findings into design for compliance. Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide. The A/E shall provide all services required to prepare documents and reports consistent with the VA s project team goals as prioritized during preliminary project meetings, field surveys and studies. The A/E shall determine existing conditions, severity of deficiencies, if any previous deficiencies have been corrected and to identify any conditions which may have previously been unreported. Cost estimates shall be prepared to reflect the cost of replacing the component in a standalone project (i.e., not as part of another project) and all costs including but not limited to asbestos removal if required, special field conditions and/or temporary equipment needed during the construction. Provide a Qualified Elevator Inspector during Construction Services to certify elevator. Also provide Part Two A/E Services (also known as Construction Period Services Type C) A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, attendance at weekly teleconference construction meetings, approximately 1 site visits per month during active construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements/QEI inspection, review of any construction project modifications for cost and technical acceptability, attendance and participation during the pre-final inspection and final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services and maintain a RFI log. B. CONTRACT INFORMATION: The VA Medical Center Central Western M…

Full text and attachments are on SAM.gov.

Source: SAM.gov notice 37836979a951480f981d6cfa43274ebd. Last checked Nov 24, 2026. Always confirm details, amendments and attachments on the official notice before you respond.