Skip to content
FedBidAlerts
Due in 1 daySDVOSBSources Sought

Renovate Specialty Clinics on 2nd

Department of Veterans Affairs

Key details

Response deadline
Nov 25, 2026, 2:00 PM EST (Due in 1 day)
Solicitation number
36C24526R0101
Notice type
Sources Sought
Product/service code
C1DA
Place of performance
Beckley, West Virginia, 25801
Office
245-network Contract Office 5 (36c245)
Posted
Nov 18, 2026

Description

Please be advised that the submission deadline for SF 330 has been extended from November 20, 2026, to November 25, 2026, at 2:00 PM EST. See responses to RFI s below. VA responses to RFI s are bold below. Could you please clarify which disciplines are anticipated to be required? For example, regarding surveying, would the scope include a building measured survey, utility survey, site topographic survey, or a combination of these? Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary. Must a licensed surveyor be included as a named member of the SF330 team, or may surveying services be provided by a consultant on an as-needed basis? Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered. Given that the primary scope involves renovating the existing second-floor clinic area, is new field surveying anticipated for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. The notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore: Existing-building measured documentation: required. Verification of utilities affecting the design: required. Please confirm if there is a page limit in addition to the 10MB PDF file size for the SF330 submission. 10MB PDF file size no page limit. For Factor II Specialized Experience and Technical Competence, the solicitation states that "recent experience means projects completed, substantially completed, or actively performed within five years before the response due date." Can the VA clarify whether this requirement is based on completion of the A/E design services? For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date. Do the requirements outlined under Factor 3 Past Performance pertain to our Section F project examples? Section F project description will not necessarily satisfy Factor III by itself. Add the required performance information and cross-reference the project numbers rather than merely repeating scope descriptions. Are CPARS / PPQs required to be included with our submission? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission. As the Solicitation expects the A/E to collaborate with other A/E firms involved in other projects throughout the facility, can the VA provide the names of the actual other A/E firms and the other projects? No. Is a space program or a list of the specific specialty clinics to be consolidated on the 2nd Floor available and can it be provided at this time? No, not at this time. The anticipated disciplines include Surveying. Given that the project is primarily an interior renovation within Building 1, can the VA clarify the anticipated scope of surveying services required for this project? Building measurement and …

Full text and attachments are on SAM.gov.

Source: SAM.gov notice e84156527a944ee3bd5001d28af5d713. Last checked Nov 23, 2026. Always confirm details, amendments and attachments on the official notice before you respond.