Skip to content
FedBidAlerts
Due in 20 daysSmall businessCombined Synopsis/Solicitation

Carpet Replacement at USCG Air Station Clearwater

Department of Homeland Security · US Coast Guard

Key details

Response deadline
Dec 18, 2026, 1:00 PM EST (Due in 20 days)
Solicitation number
20150PR270000020
Notice type
Combined Synopsis/Solicitation
Small business limit
Small if no more than $19 million in average annual receipts
Product/service code
Z2AZ
Place of performance
Clearwater, Florida, 33762
Office
Base Miami Beach
Posted
Nov 25, 2026

Description

COMBINED SYNOPSIS / SOLICITATION FOR COMMERCIAL SERVICES Solicitation Number: 20150PR270000020 Project Title: USCG Air Station Clearwater Carpet Replacement – FACENG and Supply Offices Issuing Agency: United States Coast Guard (USCG) – Base Miami Beach (Procurement & Contracting) Notice Type: Combined Synopsis / Solicitation Set-Aside Status: 100% Total Small Business Set-Aside Applicable NAICS Code: 238330 – Flooring Contractors Small Business Size Standard: $19.0 Million Contract Type: Firm-Fixed-Price (FFP) Acquisition Authority: FAR Subpart 12.6 (Streamlined Procedures for Evaluation and Solicitation for Commercial Items), FAR Part 13 (Simplified Acquisition Procedures), and FAR Part 15 Performance Location: U.S. Coast Guard Air Station Clearwater, 15100 Rescue Way, Clearwater, FL 33762 1. General Notice & Acquisition Overview This document constitutes a combined synopsis/solicitation for commercial services and minor facility improvements prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. Sole Solicitation: This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. Set-Aside: This solicitation is advertised as a 100% Total Small Business Set-Aside. Offers received from entities other than small business concerns under NAICS code 238330 will not be considered. Basis of Award: Award will be made using simplified acquisition procedures to the responsible offeror whose quote conforms to all solicitation requirements and represents the Best Value to the Government, considering technical capability/approach, past performance, and price. 2. Schedule of Supplies / Services & Pricing The Contractor shall provide all labor, supervision, materials, equipment, tools, transportation, disposal, and incidental services necessary to complete the carpet replacement project as specified in the Statement of Work. CLIN Description Qty Unit Unit Price Total Amount 0001 Base Bid: Complete carpet replacement and cove base installation throughout FACENG and Supply Office spaces, including furniture moving/reset, weekend phasing, surface preparation, adhesives, transitions, and disposal (Approx. 2,820 SF Carpet / 775 LF Cove Base) in accordance with Project 33643384 SOW. 1 Job $____________ $____________ Note: Quantities are derived from drawing takeoffs and field estimates. Offerors are responsible for field-verifying all measurements during the pre-quote site visit prior to submitting their quote. 3. Site Visit Information A formal site visit has been scheduled for prospective offerors to inspect the existing site conditions, verify carpet and cove base dimensions, evaluate access routes, and inspect furniture configurations. Date & Time: Thursday, December 10, 2026, at 10:00 AM EST Location: U.S. Coast Guard Air Station Clearwater 15100 Rescue Way, Clearwater, FL 33762 Primary COR: CWO Joe Calderon — Jose.A.Calderon@uscg.mil | Phone: (727) 423-7586 Alternate POC: LCDR Scott Kellerman — scott.n.kellerman@uscg.mil | Phone: (571) 499-0711 Required Security Submission for Site Visit: Real ID-compliant Driver’s License Number and State of Issuance Site Access Rules: Only U.S. citizens and permanent resident aliens are allowed onboard Air Station Clearwater. Attendees must present valid government photo identification at the front gate. Vehicles and equipment are subject to inspection at all times. 4. Statement of Work (SOW) — Project 33643384 4.1 Scope of Work Summary The Contractor shall furnish all labor, supervision, tools, equipment, materials, delivery, furniture moving, carpet and cove base removal, surface preparation, installation, cleanup, and disposal for the complete replacement of existing carpet and cove base throughout designated administrative areas within the FACENG and Supply building. All work must comply with the Carpet and Rug Institute (CRI) 1…

Full text and attachments are on SAM.gov.

Source: SAM.gov notice 24f063dead374eec8fdaa4556a802e63. Last checked Nov 27, 2026. Always confirm details, amendments and attachments on the official notice before you respond.