Skip to content
FedBidAlerts
Due in 55 daysSolicitation

Enhanced Use Lease for Commercial Power Generation Facility

Dept. of Defense · Dept. of the Army

Key details

Response deadline
Jan 18, 2027, 5:00 PM EST (Due in 55 days)
Solicitation number
W912-QR-DACA27-1-27-0015900
Notice type
Solicitation
Set-aside
None (full and open competition)
Product/service code
X1PC
Place of performance
Richmond, Kentucky, 40475
Office
W072 Endist Louisville
Posted
Nov 20, 2026

Description

The Department of the Army (“DA”) is issuing this Request for Proposals (“RFP” or “Solicitation”) to solicit competitive proposals from private, public and/or not-for-profit entities interested in leasing non-excess DA land (“Properties”) for development of commercial power generation facilities and data centers under a long-term lease agreement(s) (“Enhanced Use Lease” or “EUL”) at Blue Grass Army Depot, Pine Bluff Arsenal, Tooele Army Depot, Sierra Army Depot, Fort McCoy, Fort Bragg, Fort Hood, Fort Rucker, and Joint Base Lewis-McChord (“Installations”). The EUL(s) that would result from this RFP would be for the purpose of the selected Offeror(s) designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, securing, and decommissioning a commercial power generation facility and a data center (“Project”). DA’s preference is for integrated power generation facility and commercial data center Projects, but an Offeror can elect to propose power generation only. DA may elect to award one or more EULs pursuant to this RFP. Prior to expiration of the EUL(s), Lessee(s) will be required to restore the Property to the condition it was in prior to execution of the EUL(s).Offerors may submit proposals for a power generation facility only, or for a power generation facility and a data center as further described below. Proposals for a data center-only will not be considered. (1)Power Generation Facility without a Data Center Project. Offerors may submitproposals that do not include a Data Center. The proposals should includecombinations of power generation, energy storage systems, and microgrids to servepower markets. Projects will require the provision of resilient energy capabilities to DAas part of the consideration to be paid to DA. The Project may include a singletechnology or a hybrid generation portfolio, including but not limited to: •Advanced low-emission natural gas turbines •High-efficiency reciprocating internal combustion engines (RICE) •Stationary fuel cells and hydrogen generation/combustion systems •Small Modular Reactors (SMRs) •Advanced nuclear systems •Utility-scale Battery Energy Storage Systems (BESS) •Dispatchable generation combined with utility-scale solar photovoltaic (PV)arrays and energy storage (2)Power Generation Facility and Data Center Project. Offerors may submit proposalsfor both power generation and a data center. Proposals are not restricted to anyparticular data center size or capacity. However, DA’s preference is for the followingdata center frameworks in order of preference: Profile 1: Hardened, physically isolated campuses built to ICD 705 standards for Top Secret/IL6 workloads. Profile 2: Large-scale hyperscale and AI/HPC facilities targeting PUE ? 1.15. Offerors electing to integrate commercial data centers alongside generation assets may do so within a unified campus master plan. Proposed Projects must provide energy resilience capabilities to the DA that will bepart of the lease consideration to be provided to DA by the Lessee. These capabilitiesmust include the provision of resilient power within one (1) hour of a grid outage and fora minimum of fourteen (14) continuous days, and providing any required improvementsto DA’s utility infrastructure that may be required to enable the Installation to acceptdelivery of the resilient power. For purposes of this RFP, a grid outage is defined asany loss of power from the grid serving the Installation. Preference will be given toOfferors whose Proposal is for the provision of contingency power in excess offourteen (14) continuous days. DA expects that all power generated and data center capacity (where applicable) willbe sold to third-party off-taker(s). The selected Offeror will be responsible for identifyingand securing off-taker(s). The Installations included in this solicitation are located in both competitive andvertically integrated utility markets. All Projects must comply with the utility regulations,suc…

Full text and attachments are on SAM.gov.

Source: SAM.gov notice 73fce2ff9cb44b34808f768470b25537. Last checked Nov 23, 2026. Always confirm details, amendments and attachments on the official notice before you respond.