Due in 260 daysSources Sought
F16_AN_APG68_ElectronTube_5960011538780_PN_585R224H01_3
Dept. of Defense · Dept. of the Air Force
Key details
- Response deadline
- Aug 12, 2027, 12:00 AM EDT (Due in 260 days)
- Solicitation number
- F16_AN_APG68_ElectronTube_5960011538780_PN_585R224H01_3
- Notice type
- Sources Sought
- Set-aside
- None (full and open competition)
- Place of performance
- Tinker AFB, Oklahoma, 73145
- Office
- Fa8122 Afsc Pzaab
- Posted
- Aug 12, 2025
Description
P/N: 585R224H01, 585R224H03 Noun: Electron Tube Application: F-16 AN/APG-68 Radar Dual Mode Transmitter 4 Oct 2021 Section C 1/3 SECTION C: 1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Electron Tube. b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government. c. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Northrop Grumman (97924) drawing 585R224. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications. d. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416 SCMSGUEAA. The offeror shall also identify its sources for materials and its standards for internally used processes. e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 416 SCMSGUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 585R224H01,H03. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMSGUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests. f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 585R224H01,H03.. This article shall be subjected to a form, fit, REPAIR QUALIFICATION REQUIREMENTS NSN: 5960-01-153-8780 P/N: 585R224H01, 585R224H03 Noun: Electron Tube Application: F-16 AN/APG-68 Radar Dual Mode Transmitter 4 Oct 2021 Section C 2/3 and function evaluation to demonstrate compatibility with the weapon system and to evaluate the repair capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 90 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify product…
Full text and attachments are on SAM.gov.
Source: SAM.gov notice eeab99e6f88447428550acd7572d8ede. Last checked Nov 24, 2026. Always confirm details, amendments and attachments on the official notice before you respond.