Skip to content
FedBidAlerts
Due in 14 daysSolicitation

Fire Suppression System Maintenance and

Department of Veterans Affairs

Key details

Response deadline
Dec 8, 2026, 10:00 AM EST (Due in 14 days)
Solicitation number
36C25027Q0078
Notice type
Solicitation
Set-aside
None (full and open competition)
Product/service code
J012
Office
250-network Contract Office 10 (36c250)
Posted
Nov 19, 2026

Description

Site Visit: A site visit will be held on December 1, 2026, at 9:00 a.m. ET. Interested vendors should meet at building 6 at the Richard L. Roudebush VA Medical Center, 1481 W. 10th Street, Indianapolis, IN 46202. See map and pinned location below for building 6. Following the walkthrough of the main hospital, vendors may attend an additional walkthrough at the off-site location: 9045 East 59th Street, Building 402, Indianapolis, IN 46216. Please note that transportation to the off-site location will not be provided by the VA. RFI Responses Submitted by: Gunnar Sager, COO, FinalLine Solutions L.L.C. INFORMATION NEEDED: 1.Site visit PWS §§ 7, 8, 11 and Appendix A. Can the VA arrange a pre-quote site visit at both the main medical center and Building 402 for FinalLine Solutions and its prospective kitchen exhaust cleaning and fire protection subcontractors? We would like to see the three Canteen hoods (C-1166), the Production Kitchen hood (C-B144) and its upper-floor duct and fan connections, the rooftop exhaust fans, the Building 402 hood, suppression system and grease trap, and the Kidde IND-21 units at Buildings 1 and 22. Please provide available dates and times, the meeting location, and any registration, escort or ID requirements. Yes, a pre-quote site visit can be arranged. 2.Exhaust duct routes and access PWS § 7 and Appendix A.2. PWS § 7 refers to "the eight previously listed main-campus duct systems." Please identify those eight systems. Can the VA also provide any available duct drawings or route sketches, fan and access-panel locations, and known inaccessible sections, particularly for the Production Kitchen and the fourth- and fifth-floor connections? If a site visit cannot be arranged, please provide any photos or prior cleaning reports that show existing access conditions. The eight systems were a reference to language in the previous contract. The PWS has been updated to remove that language, as the VA is uncertain what it was referring to. The PWS has also been updated to include exhaust fan locations. The rest can be determined by a site visit. Previous cleaning reports, including one dated April 2026 is attached, that includes photos in response to this RFI. 3.Building 402 grease trap PWS §§ 8, 11 and Appendix A.3. Please confirm the trap type and capacity (gallons), the cover location, and the approved overnight pump-truck staging location. If known, please provide the approximate hose distance from the staging point to the trap and any vehicle size, weight or access restrictions. Unknown. Can be determined by the offeror during scheduled site visit. 4.Building 402 equipment Appendix A.1 and A.2. Please confirm the make, model and agent type of the Building 402 kitchen suppression system (KS-05) and the exhaust fan ID serving hood KH-05. Unknown. Can be determined by the offeror during a scheduled site visit. 5.Prior service history PWS § 5 and Appendix A.4. PWS § 5 requires the schedule to use verified prior service dates and states that a contract transition does not restart intervals. Please provide the current or most recent contractor's service records, or at minimum the last completion dates, for each suppression unit (monthly, semiannual and annual), each hood cleaning (KH-01 to KH-05) and the GT-01 pump-out. Please also identify any work currently overdue. According to our records it is believed to be as follows: KH-1 to KH-04 Fire Semi-Annual Inspections were completed on 10/20/2026. Cleanings for these systems were completed on 10/26/2026. KH-5 was cleaned in September 2026, the Semi-annual inspection date is unknown and assumed due. GT-01 was cleaned in September 2026. HM-01 to HM-05 Semi-annual inspections were completed on 10/20/2026. 6.Extended-interval testing PWS § 9 and Appendix A.4. Please identify any extended-interval maintenance or testing known to be due during the base or option years, along with the affected system IDs and anticipated due dates. If any of this work must be price…

Full text and attachments are on SAM.gov.

Source: SAM.gov notice 36075988f2b74487a1385383f1b88619. Last checked Nov 23, 2026. Always confirm details, amendments and attachments on the official notice before you respond.