Skip to content
FedBidAlerts
No deadline listedPresolicitation

John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)

Dept. of Defense · Dept. of the Army

Key details

Response deadline
Not listed
Solicitation number
W9127N27BA007
Notice type
Presolicitation
Set-aside
None (full and open competition)
Small business limit
Small if no more than $19 million in average annual receipts
Product/service code
Z2EZ
Office
W071 Endist Portland
Posted
Oct 29, 2026

Description

NOTICE OF SOLICITATION NUMBER CHANGE The John Day Powerhouse HVAC Upgrades acquisition, previously announced under presolicitation notice number W9127N26BA006, is now identified as W9127N27BA007 due to the fiscal-year transition. This presolicitation notice continues the announcement of the same acquisition under the new number; it does not represent a separate requirement. All subsequent notices and solicitation documents for this acquisition will reference solicitation number W9127N27BA007. The original presolicitation notice under W9127N26BA006 is available here: https://sam.gov/workspace/contract/opp/7efeefdf2b3c493d89f14b5ce67ff62a/view The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse. JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington. JDA spans two states, with Units 1 through 14 located in Sherman County, Oregon, and Units 15 and 16 in Klickitat County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 2 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful offeror must have a current CMMC status at Level 2 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the offeror ineligible for contract award. CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI or CUI on contractor information systems in the performance of this DoD contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows: If a subcontractor will only process, store, or transmit FCI (and not CUI) in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor. If a subcontractor will process, store, or transmit CUI in performance of the subcontract, then a CMMC status of Level 2 (Self), or higher, is required for that subcontractor, and must be current in SPRS prior to subcontract award. Prime contractors are responsible for ensuring that all covered subcontractors obtain and maintain the appropriate CMMC level and assessment type for the information they will process, store, or transmit during performance. For this solicitation, contractors requesting access to documents containing FCI or CUI must have an active SAM registration and a current NIST SP 800 171 assessment with at least a Basic confidence level recorded in SPRS. Summary of Work: Work includes but is not limited to the following: 1. Complete replacement of the primary and installation of secondary chillers on two chilled water loops serving the majority of the Powerhouse galleries. 2. Demolition and removal of the existing system and installation of four new chiller skid packages totaling approximately 600 tons of refrigeration capacity. 3. New electrical feeds, chilled water pumps, piping, and air handler units, with selective reuse of existing components. 4. Systems must be integrated into a new automated digital HVAC control system. 5. Half of the new systems will be water-cooled; half will be converted to air-cooled. For the air-cooled units, roof-mounted air-cooled condensers will be installed, requiring roof penetrations, piping, and building modifications. 6. HVAC upgrades include new intake and …

Full text and attachments are on SAM.gov.

Source: SAM.gov notice 61ff2d54f9114299950236018dce1902. Last checked Nov 24, 2026. Always confirm details, amendments and attachments on the official notice before you respond.