Due in 24 daysSources Sought
Market Intelligence Notice – Pre-Engineered Metal Buildings (PEMB)
Dept. of Defense · Dept. of the Army
Key details
- Response deadline
- Dec 18, 2026, 4:00 PM EST (Due in 24 days)
- Solicitation number
- W912HN26MIPEMB
- Notice type
- Sources Sought
- Set-aside
- None (full and open competition)
- Place of performance
- Savannah, Georgia, 31401
- Office
- W074 Endist Savannah
- Posted
- Nov 22, 2026
Description
Market Intelligence Notice – Pre-Engineered Metal Buildings (PEMB) Disclaimer: This RFI is issued solely for information and planning purposes. It does not constitute a solicitation or a commitment to issue a solicitation in the future. The Government will not pay for any information or administrative costs incurred in response to this RFI. 1.0 Objective The U.S. Army Corps of Engineers (USACE), Savannah District (SAS) is seeking market intelligence to identify and assess industry capabilities relevant to the construction of various facilities on military installations utilizing the Pre-Engineered Metal Building construction methodology. The Government is pursuing modern industrialized construction approaches intended to improve schedule, cost, and lifecycle outcomes for this facility type. For purposes of this RFI, respondents should clearly identify whether they view these features as: Fully compatible with their standard commercial or industrialized building system; Achievable with modifications; or Better addressed through an alternative technical solution that provides equal or better performance. Where respondents recommend alternatives, the response should explain how the proposed approach would satisfy or improve upon the Government's desired performance outcomes for schedule; cost; capacity/readiness; quality and durability; energy consumption; repeatability/scalability; site and installation impact; and compliance/turnover. Information provided by respondents will be used to help the Government understand available market participants, solution types, and industry interest, and will inform future industry engagements, acquisition planning, and assessment of potential use of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. 2.0 Forecasted Project(s) Overview The projects identified below represent current candidates for industrialized construction methodologies across multiple military installations. This listing is non-exhaustive and subject to change. Solutions deployed under this initiative may be adapted and scaled across additional facilities as future requirements are defined. Note: Projects may include secure spaces. Auto Multi-Purpose Machine Gun Range Construct a modified standard design Multipurpose Machine Gun (MPMG) Range at Fort Bragg, North Carolina. Primary facilities include the MPMG Range, Range Control Tower, Range Operations and Storage Building, Range Classroom Building, Covered Mess, Ammunition Breakdown Building, Covered Bleacher, and building information systems. Supporting facilities include site improvements, paving, erosion control measures, electric service, and information systems. Facilities will be designed to a minimum life span of 40 years in accordance with Department of War’s (DoW) Unified Facilities Criteria (UFC 1-200-02), including energy efficiencies, building envelope and integrated building systems performance. Demolish 2 buildings at Fort Bragg, NC (459 Total ft2) LFSHX - Live Fire Exercise Shoothouse Construct standard design Live Fire Exercise Shoothouse. Primary facilities include the shoothouse, range operations control area, after action review building (small), operations/storage building (small), ammunition breakdown building, and latrine (aerated vault type). Supporting facilities include electric service, site improvements, and information systems. Access for persons with disabilities will be provided in the control and maintenance buildings. Air conditioning/heating: 4 tons. Supporting facilities cost is high due to the distance to the nearest utility hookups. Facilities will be designed to a minimum life span of 40 years in accordance with DoW's Unified Facilities Criteria (UFC 1-200- 02) including energy efficiencies, building envelope and integrated building systems performance. 38RQS Guardian Angel Squadron Ops Construction of two new rescue squadron operations facilities, aircrew flight equipment facility, rescue ma…
Full text and attachments are on SAM.gov.
Source: SAM.gov notice f4c0c908f2ac4b29a21ca8e2586a8b58. Last checked Nov 24, 2026. Always confirm details, amendments and attachments on the official notice before you respond.