Skip to content
FedBidAlerts
Due in 9 daysSources Sought

Market Survey Sources Sought Notice for Barrier Iib Ats Systems Replacement

Dept. of Defense · Dept. of the Army

Key details

Response deadline
Dec 7, 2026, 3:00 PM EST (Due in 9 days)
Solicitation number
W912P627X1CZ7
Notice type
Sources Sought
Set-aside
None (full and open competition)
Small business limit
Small if no more than $19 million in average annual receipts
Product/service code
Z2BG
Office
W072 Endist Chicago
Posted
Nov 24, 2026

Description

SOURCES SOUGHT NOTICE / MARKET SURVEY Project Title: Barrier IIB Automatic Transfer Switch (ATS) System Replacement************** Procurement Identification: PANGLR -26 -034692**************NAICS Code: 238210 Electrical Contractors and Other Wiring Installation Contractors (Small Business Size Standard: $19.0 Million)**************PSC Code: Z2BG Repair or Alteration of Electronic and Communications Facilities**************Estimated Project Magnitude / Cost: Between $250,000 and $500,000************** Primary Performance Location: Chicago Sanitary and Ship Canal Electric Dispersal Barrier Facility (USGS / USACE Facility), 790 East Old Romeo Rd., Lockport/Romeoville, IL 60441*****************By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the Barrier IIB Automatic Transfer Switch (ATS) System Replacement. The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of an RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Notice will be solely at the responding party expense.***************t this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this Notice. Responses to this Notice will not be returned. Please be advised that all submissions become Government property and will not be returned. Not responding to this Notice does not preclude participation in any future RFQ. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. It is the responsibility of the interested parties to monitor this site for additional information pertaining to this Notice.*******GOVERNMENT REQUIREMENTS Under the proposed contract, the contractor will be required to provide turnkey engineering, procurement, programming, fabrication, removal, installation, testing, and commissioning services for the controls modernization of the Barrier IIB Automatic Transfer Switch (ATS) and Emergency Generator Paralleling Switchgear line-up (originally installed circa 2010).*********Scope Summary:************The project requires the complete replacement and modernization of obsolete proprietary electronic control modules, network processors, transducers, and human-machine interface (HMI) touchscreens with modern, open-architecture, commercial-off-the-shelf (COTS) industrial control components.************The contractor shall provide a complete, non-proprietary functional solution meeting the following performance characteristics without relying on single-source, dealer-locked software or hardware:**************1. Master, Utility, Tie, and Generator Control Processors:************Furnish and program modular, open-architecture Programmable Logic Controllers (PLCs) or purpose-built Digital Generator Paralleling Controllers with industrial Ethernet communications.************** Provide dedicated processing hardware for:************* Master Switchgear Control (redundant processors AP1 and AP2)******** Generator Breaker Controls (dedicated controller per generator breaker)**********Utility Incoming Breaker Control (dedicated controller per utility breaker)*********Tie Breaker Control (dedicated controller per tie breaker)**********The control logic must automatically perform utility sensing, automatic transfer, generator start sequencing, dead-bus closing, auto-synchronization, isochronous kW and kVAR load sharing, soft-load open/closed-transition utility return, and load shed/add …

Full text and attachments are on SAM.gov.

Source: SAM.gov notice d13db3ad548f4e1cb0a6bc7bef73a313. Last checked Nov 27, 2026. Always confirm details, amendments and attachments on the official notice before you respond.