Roof Snow Block
Dept. of Defense · Dept. of the Air Force
Key details
- Response deadline
- Nov 27, 2026, 5:00 PM EST (Due in 3 days)
- Solicitation number
- FA446027Q0004
- Notice type
- Sources Sought
- Set-aside
- Small Business Set Aside - Total
- NAICS code
- 332322 Sheet Metal Work Manufacturing
- Product/service code
- 5650
- Place of performance
- Little Rock Air Force Base, Arkansas, 72099
- Office
- Fa4460 19 Cons Pka
- Posted
- Nov 20, 2026
Description
This acquisition is a new requirement for the procurement of an engineered, continuous pipe or fence-style rail snow retention system for facility roof installation. System Configuration: Must be a continuous horizontal pipe- or fence-style rail snow retention system capable of bridging across structural roof panels and providing continuous longitudinal perimeter retention. Retention Capacity & Coverage: System must furnish 720 linear feet of continuous perimeter retention coverage. Substrate Compatibility: Mounting clamps and hardware must be fully compatible with the host metal roofing profile (e.g., standing seam or exposed fastener). Attachment systems for standing-seam profiles must utilize non-penetrating clamping mechanisms to preserve the weather-tight integrity and manufacturer warranty of the roof panels. Structural Performance Thresholds: System components (brackets, clamps, rails, and fasteners) must be engineered and rated to resist site-specific snowpack and ice accumulation shear loads without permanent mechanical deflection. Clamp-to-seam holding strength must meet or exceed minimum structural thresholds (e.g., capable of sustaining design loads up to 500 lbs per clamp or linear foot minimum, adjusted to site-specific engineering design calculations). Fastening hardware must utilize round-point or non-cutting setscrew designs (e.g., 300-series stainless steel per ASTM F880) to prevent piercing, galling, or compromising protective coatings on metal roof seams.
Source: SAM.gov notice 3a51490b15f34443a76821f3b67e10df. Last checked Nov 23, 2026. Always confirm details, amendments and attachments on the official notice before you respond.