Skip to content
FedBidAlerts
Due in 13 daysSources Sought

Sources Sought – Potential Sole-Source Title II/Type “C” Architect-Engineer Services, Project No. 431850, Camp Santiago, Puerto Rico

Dept. of Defense · Dept. of the Army

Key details

Response deadline
Dec 7, 2026, 3:00 PM EST (Due in 13 days)
Solicitation number
PRARNG27SS39258
Notice type
Sources Sought
Set-aside
None (full and open competition)
Product/service code
C219
Place of performance
Salinas, Puerto Rico, 00751
Office
W7pa Uspfo Activity Pr Arng
Posted
Nov 19, 2026

Description

Notice Type: Sources Sought Notice Number: PRARNG-27-SS39258 Notice Title: Sources Sought – Potential Sole-Source Construction-Phase (Title II / Type “C”) Architect-Engineer Services, Project No. 431850, Camp Santiago, Puerto Rico PSC: C219 — Architect and Engineering - General: Other NAICS Code: 541330 — Engineering Services (Size Standard: $25.5 Million) Publication Date: 20 November 2026 Response Date: 7 December 2026, 1600 AST Contracting Office: United States Property and Fiscal Office (USPFO) for Puerto Rico, Purchasing and Contracting Division, San Juan, PR 00904-9002 Synopsis: This is not a solicitation nor a request for Architect-Engineer Qualifications using SF 330. The Government will not issue an award resulting from this sources sought. There are no solicitation documents. This notice is for market-research purposes only. The United States Property and Fiscal Office (USPFO) for Puerto Rico is conducting market research to identify responsible sources capable of providing Construction-Phase Architect-Engineer services (commonly referred to within the National Guard as Title II / Type “C” services) for Project No. 431850, Engineering Housing Maintenance Shop (EHMS), Camp Santiago Joint Training Center, Salinas, Puerto Rico. The original Designer of Record, CH2M HILL–HDR JV (CAGE: 750V1), prepared and sealed the final design package (NGB Type A and Type B) under Task Order W912LR21F0002 and completed the Code and Criteria design recertification on 6 March 2026 under Contract W912LR25CA001. Construction Contract W912LR27CA001 was awarded on 16 October 2026. Notice to Proceed is anticipated on or about 8 December 2026, with initial technical submittals due on or about 7 January 2027 and physical construction mobilization scheduled for 30 January 2027. This requirement is for professional A-E services governed by 40 U.S.C. § 1101 et seq. and RFO FAR 36.102 and 36.202. The period of performance will be 730 calendar days. The selected firm must commence initial technical-submittal review services within five (5) calendar days after issuance of the A-E Notice to Proceed and provide construction-phase support no later than 15 January 2027. Required Construction-Phase (Title II / Type “C”) A-E services include registered professional engineering and architectural technical supervision, design-intent interpretations, technical evaluations and recommendations for Government approval on Requests for Information (RFIs), shop drawings, and technical submittals; on-site resident construction observation; inspection documentation and technical reporting in support of Government quality-assurance functions; review of material testing results; technical verification of red-line as-built record drawings; and design-conformance verification of building systems performance against the approved design baseline. All contractual direction that changes contract scope, price, terms, or schedule remains the exclusive authority of the Government Contracting Officer. The Construction-Phase A-E contractor will provide technical evaluations and recommendations only and will not direct the construction contractor or approve deviations from contract requirements. The Government is considering whether this requirement may qualify as a follow-on acquisition under 10 U.S.C. § 3204(a)(1) and § 3204(b), as implemented by RFO FAR 6.103-1, on the basis of potential substantial duplication of cost or unacceptable delay. Information received in response to this notice will be evaluated and considered in determining whether to conduct a competitive A-E acquisition or pursue a sole-source approach. Key Considerations the Government Will Evaluate: The original firm’s continuing professional responsibility under its prior contracts and the requirements of Puerto Rico Law 173 of 1988 (20 L.P.R.A. §§ 711 et seq.) regarding technical control and sealing of professional work. The effort and cost that would be required for a new firm to validate the existing final d…

Full text and attachments are on SAM.gov.

Source: SAM.gov notice 50b964c960254292b0b882dfdd4f1a57. Last checked Nov 23, 2026. Always confirm details, amendments and attachments on the official notice before you respond.