Due in 10 daysSources Sought
Thomas P. Stafford Building (TPS) Restroom Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK
Department of Transportation · Federal Aviation Administration
Key details
- Response deadline
- Dec 4, 2026, 4:00 PM EST (Due in 10 days)
- Solicitation number
- TPSBathroomUpgrades
- Notice type
- Sources Sought
- Set-aside
- None (full and open competition)
- Small business limit
- Small if no more than $45 million in average annual receipts
- Product/service code
- Y1AA
- Place of performance
- Oklahoma, 73169
- Office
- 6973gh Franchise Acquisition Svcs
- Posted
- Nov 16, 2026
Description
*********************THIS IS A MARKET SURVEY ONLY************************* - This is not a Screening Information Request or Request for Proposals of any kind; - The FAA is not seeking or accepting unsolicited proposals; - The FAA will not pay for any information received or costs incurred in preparing the response to the market survey; and - Any costs associated with the market survey submittal are solely at the interested vendor’s expense. - The responses to this market survey will be used for informational purposes only. This is not a Screening Information Request or Request for Proposal of any kind. The FAA is not seeking or accepting proposals at this time. ****************************************************************************** 1. This is a market survey for a construction project titled: Thomas P. Stafford Building (TPS) Restroom Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK. 2. The Magnitude of Construction is between $5,000,000 and $10,000,000. Performance and payment bonds will be required in a penal sum equal to 100% of the contract price. The Thomas P. Stafford Building (TPS) at the MMAC is a 222,130 gross square foot building originally constructed in 1991 and is comprised of a basement and two floors above grade. The Thomas P. Stafford Building (Building 27) at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City functions as a state-of-the-art training complex. It houses the FAA Academy, providing advanced classrooms and simulation laboratories for air traffic control and Technical Operations students and instructors. This project will upgrade the restrooms to meet ADA compliance and will also include upgrades to the corridor finishes. Work associated with construction of this project will be done primarily after hours (Midnight 12:00 am to 6:00 am Monday through Friday) and weekends to prevent disturbance to classes while the building is occupied. The building is fully occupied and runs two shifts of classes from 6:00am to midnight 12:00am Monday through Friday. The work required for the facility will include the following: Provide all labor, equipment, and material to renovate all restrooms on all floors and to upgrade common area finishes in the Thomas P. Stafford building. Requirements will be detailed in the construction plans and specifications provided by the FAA. The project includes: Architectural Restroom Scope: Replace finishes and fixtures in bathrooms on all floors. Replace wall tile, countertops, sinks, faucets, partitions, paint ceilings and doors, new door push plates and kick plates. Provide temporary trailer restrooms to maintain current fixture counts during renovation of restrooms. Only one Men’s and one Women’s restroom in the facility shall be under construction at a time. ADA automatic door openers are to be protected during construction and/or re-installed and operational after renovation at restrooms in which they occur. Mechanical Restroom Scope: Replace supply diffusers and exhaust grilles in restrooms. Fire Sprinkler Scope: Modify fire sprinklers as required. Electrical Restroom Scope: Provide the electrical effort required to upgrade/replace the Lighting and Lighting Controls as part of the coordinated Restroom Upgrades. LD lighting shall be used for both general lighting and egress lighting with footcandle illumination levels meeting both Life Safety required code levels and IES recommended target design levels. Architectural Finishes in Common Circulation Areas Scope: Demo and replace millwork in the Snack Bar area on the first floor. Replace the flooring in the café. This work will take place after café hours. Flooring replacement to be accomplished over a long weekend and be ready for business opening the following week or at least be in a state to allow normal and sanitary operations of the café to continue until work is complete. Corridor walls to full height and gypsum wall board ceilings to receive new high traffic quality paint. Th…
Full text and attachments are on SAM.gov.
Source: SAM.gov notice 0269b7f9e6d244f9b35d161bb47e033e. Last checked Nov 24, 2026. Always confirm details, amendments and attachments on the official notice before you respond.