Skip to content
FedBidAlerts
Due in 13 daysSDVOSBPresolicitation

FCA Replace Building 51 Roof

Department of Veterans Affairs

Key details

Response deadline
Dec 7, 2026, 5:00 PM EST (Due in 13 days)
Solicitation number
36C25527R0020
Notice type
Presolicitation
Small business limit
Small if no more than $45 million in average annual receipts
Product/service code
Z2DA
Place of performance
St. Louis, Missouri, 63125
Office
255-network Contract Office 15 (36c255)
Posted
Nov 22, 2026

Description

Project # 657-27-103JB, FCA Replace Building 51 Roof The Department of Veterans Affairs, Network Contracting Office (NCO) 15, has a requirement to Replace Building 51 Roof, project number 657-27-103JB, located at the U.S Department of Veterans Affairs, Str. Louis VAMC Jefferson Barracks 1 Jefferson Barracks Drive St. Louis, MO 63125 The following narrative is intended to provide an overview of the scope of work for the proposed project. Period of Performance 222 calendar days after Notice to Proceed (NTP) Scope of Work Furnish complete construction services to replace all designated Building 51 roofs, including projections, entrance roofs, and connecting portions. The preliminary net roof area is approximately 56,000 square feet, subject to field verification. Provide a watertight thermoplastic polyolefin (TPO) roofing system in accordance with the VA-prepared drawings and specifications. Contractor shall submit shop drawings, product data, and installation details for all proposed materials, equipment, and systems to be installed or replaced under this contract for VA review prior to commencing the associated work. Submittals shall include applicable manufacturer's specifications and required engineering certifications. Schedule, phasing, and occupied operations: Complete construction and closeout within 222 calendar days after the Notice to Proceed issue date. Building 51 remains occupied and operational 24 hours per day, seven days per week. Work hours are from 7:00 a.m. to 4:30 p.m., local time. Submit a contractor-developed phasing plan for the Contracting Officer's Representative (COR) to review before roofing. Complete both highest penthouse roof platforms first on the original building and the highest roof section first on the addition; either building portion may be started first. Maintain safe access, utilities, and required infection-control and HVAC-intake protection. Provide construction fall protection and keep the building watertight; coordinate service interruptions with the VA. Investigation and Roofing Requirements: Hazardous Materials: While neither Asbestos Containing Material nor Lead is expected to be encountered within the scope of this project, it will be the responsibility of the contractor to hire an independent 3rd party VPIH to complete the related work if they are to encounter a material that they deem suspicious. Demolition limit: At the original building (Zones 1-7, 13, and 14), remove the existing roofing assembly through the base sheet to the top of the Zonolite lightweight-concrete topping; retain the topping and underlying structural concrete deck. At the addition (Zones 8-12 and 15), remove the existing roofing assembly, including insulation and intervening layers, to the top of the metal roof deck; retain the deck and supporting structure. Clean and inspect retained surfaces, and repair deterioration within specified repair limits. Report differing construction or deterioration beyond those limits to the COR before proceeding with affected work. New roof and mechanical securement: Install mechanically fastened rigid insulation, adhered cover board, and fully adhered 70-mil TPO roofing membrane with continuous hot-air-welded seams. Contractor shall verify that the proposed fastening system is compatible with Building 51's existing roof construction. Parapets, penetrations, and retained metal: Extend new roofing up parapets to the existing flashing. Flash and seal, with the correct system specific boots, all roof penetrations with compatible membrane extending at least 8 inches above the finished roof, or higher where required by applicable VA criteria and manufacturer/warranty requirements. Retain metal flashings, flanges, and coping unless scheduled for replacement, and replace roofing beneath retained metal. Specific Replacement and Repairs: Associated roof work: Retain rooftop HVAC units in place and replace roofing beneath elevated units and frames and around curbs. Replace old or deteri…

Full text and attachments are on SAM.gov.

Source: SAM.gov notice d4533313366d49a8826392a623a45e36. Last checked Nov 24, 2026. Always confirm details, amendments and attachments on the official notice before you respond.